... | 🕐 --:--
-- -- --
عاجل
⚡ عاجل: كريستيانو رونالدو يُتوّج كأفضل لاعب كرة قدم في العالم ⚡ أخبار عاجلة تتابعونها لحظة بلحظة على خبر ⚡ تابعوا آخر المستجدات والأحداث من حول العالم
⌘K
AI مباشر
185718 مقال 299 مصدر نشط 38 قناة مباشرة 9014 خبر اليوم
آخر تحديث: منذ 3 ثواني

Plans to change HS2 train size could reduce capacity and speed in north, says expert

تكنولوجيا
The Guardian
2026/04/13 - 18:56 501 مشاهدة

Review of original train order is meant to prevent service problems north of Birmingham, but it may do the opposite

Plans to change the size of HS2 trains to maximise capacity are likely to inflate costs and mean fewer seats and slower services north of Birmingham, a senior government and rail industry figure has warned.

The £2bn order for 54 high-speed trains, to be built in Britain by a joint venture of Alstom and Hitachi, is under review as HS2 Ltd seeks to cut costs and renegotiate contracts.

Continue reading...
مشاركة:

مقالات ذات صلة

AI
يا هلا! اسألني أي شي 🎤