Phosphate Extraction at the Bled el-Hadba Mine to Start at the End of April

The integrated phosphate mine in Bled El Hadba, Tebessa (eastern Algeria) will begin operations at the end of April, with an export berth being allocated at the port of Bejaia, the Chief of Staff of the Secretary of State for Mines at the Ministry of Hydrocarbons and Mines, Djamal Eddine Choutri, announced on Monday.
During his appearance on the “Forum of the Radio Channel 1”, Djamal Eddine Choutri confirmed that there is coordination between various sectors to complete the zinc and lead project. At the Tala Hamza and Oued Amizour projects, the energy sector is responsible for connecting them to the electricity grid, and the public works sector is responsible for connecting the road to the highway access point. Additionally, an overpass is being constructed to link the mine to the living quarters, in conjunction with ongoing work at the Bejaia port, and creating a designated berth for future exports.
شاهد المحتوى كاملا على الشروق أونلاين
The post Phosphate Extraction at the Bled el-Hadba Mine to Start at the End of April appeared first on الشروق أونلاين.





