... | 🕐 --:--
-- -- --
عاجل
⚡ عاجل: كريستيانو رونالدو يُتوّج كأفضل لاعب كرة قدم في العالم ⚡ أخبار عاجلة تتابعونها لحظة بلحظة على خبر ⚡ تابعوا آخر المستجدات والأحداث من حول العالم
⌘K
AI مباشر
298620 مقال 299 مصدر نشط 38 قناة مباشرة 4923 خبر اليوم
آخر تحديث: منذ ثانية

‘People can see – but can’t use it’: mystery of completed East-West Rail line that has no passenger trains

تكنولوجيا
The Guardian
2026/05/02 - 06:00 501 مشاهدة

The East West Rail project linking Oxford to Milton Keynes was finished in 2024. There’s just one hitch: no services

The rumbling noise in the night, still enough to waken the unhabituated, is what really goads some people living in Winslow, Buckinghamshire. Freight trains running through the new station since late 2024 prove this stretch of railway is operational. But the long-promised passenger services have yet to appear – and there is no sign of any arriving soon.

Welcome to East West Rail, open or not. For well over a decade, ministers have talked up a new railway linking Oxford to Cambridge via Milton Keynes to accelerate the drive for housing, jobs and growth – an arc of tech industry hailed as the UK’s answer to Silicon Valley.

Continue reading...
مشاركة:

مقالات ذات صلة

AI
يا هلا! اسألني أي شي 🎤