Bill Gates warns Microsoft, Amazon, Google on data center push
•Bill Gates has told the AI industry it does not have permission to drive up household electricity bills, warning Amazon, Google, Meta and Microsoft that the old utility-funded grid model is finished.
•Speaking on CNBC, the Microsoft co-founder said hyperscalers must now pick data centre sites where the economics and politics hold.
•With 48 projects worth $156 billion already blocked in 2025 and public opposition at record highs, the buildout is colliding with sentiment.
هذا الخبر من Times of India. خبر يقدم أدوات ذكاء اصطناعي للتلخيص والترجمة والاستماع.
Bill Gates has told the AI industry it does not have permission to drive up household electricity bills, warning Amazon, Google, Meta and Microsoft that the old utility-funded grid model is finished. Speaking on CNBC, the Microsoft co-founder said hyperscalers must now pick data centre sites where the economics and politics hold. With 48 projects worth $156 billion already blocked in 2025 and public opposition at record highs, the buildout is colliding with sentiment.المصدر: Times of India | Source: Times of India
ملاحظة تحريرية | Editorial Note: نُشر هذا المقال في الأصل بواسطة Times of India. خبر (Khabr) هي منصة إعلامية أردنية مرخّصة تعمل بالذكاء الاصطناعي. نضيف قيمة تحريرية من خلال: تحليل ذكي للأخبار، ملخصات تلقائية، رواية صوتية بالذكاء الاصطناعي، ترجمة متعددة اللغات، وتدقيق الحقائق. هدفنا جعل الأخبار أكثر وضوحاً وسهولةً للقارئ العربي.
This article was originally published by Times of India. Khabr is a licensed Jordanian AI-powered news platform (Registration #82086). We add editorial value through: AI-powered news analysis, automated summaries, AI audio narration, multi-language translation (Arabic, English, French, Turkish), and AI fact-checking. Our mission is to make news more accessible and understandable for Arabic-speaking audiences worldwide.

